How Much Are You Leaving On The Table?
Slide to see your potential profit boost with a curated design package
Unrealized Profits
$2,500,000.00
Industry surveys show top flippers believe good design boosts ARV by at least 10%. What you are seeing here is based on a 10% difference.
Transform Your Flipping Process
Everything you need to design, order, and track your flip renovation materials in one place.
Select Your Design Style
Material Takeoff Sheet
Input the property information and material needed into our takeoff form. This makes sure you remember all materials needed, their sizes, and quantities so you're not holding up the project. Once this information is inputted, the software creates a list of every item you need to purchase to complete the flip.
Material Takeoff Form
Bathroom
3 items added
Kitchen
5 items added
Contractor Design Guides
Based on the materials needed, the software will create a contractor design guide for all of your subs and GC/Project Manager. These include electrical, plumbing, tile, finishes/hardware, paint, and accent wall sheets your contractors know exactly where everything goes. No more calling you in the middle of the day or you showing up to the jobsite to see tile in the wrong bathroom.
Contractor Design Guide
Material Cost Calculator
AI Agent Ordering
Instead of ordering materials one by one, we created an AI Ordering Agent that adds all of the materials to your cart for you. Simply press a button and see all of your materials appear in your cart. All you have to do is press checkout, and boom, all of your materials for your project have been ordered.
AI Ordering Assistant
Delivery Tracking
Tired of logging into 4 different websites and navigating 100s of materials to check order status? Tired of your contractors or project manager asking you when a certain material will be at the house? Have all of your delivery dates in one place and be able to share all or certain categories with your team in the click of a button.
Delivery Tracker
Arrived: Apr 2, 2025
Expected: Apr 6, 2025
Expected: Apr 10, 2025